JavaScript is required

锐德 Rehm 氮气回流炉 VisionXP+ 2450

设备尺寸(W*D*H): 4990x1576x1570mm

设备重量: 约3300kg

电源要求: 3x400VAC±5%50Hz/other voltages upon request

气源要求: min.7bar–max.8bar

设备简介:The VisionXP+ Energy-efficient system ensures low-maintenance production.Vacuum chamber,Rehm CoolFlow,Pyrolysis,SSP+.展开更多

设备参数
设备文档
配件清单
PROCESS CHAMBER HEATING
type
type 523
Required area
7,86m²
Load per unit area
400kg/m²
Length
2450mm
Quantity of preheating zones
5
Length of preheating zones
1750mm
Quantity of peak zones
2
Length of peak zones
700mm
Max. permissible soldering temperature : preheating zones
300°C
Max. permissible soldering temperature : peak zones
350°C
Heat transfer through
Forced convection
Gas circulation per heating zone
max.350㎥/h
Warm up time
ca.30min/approx30min
Cross profile (Delta T=Tmax _ Tmin)
±2,5Kelvin
COOLING ZONE
Length
1050mm
PIN CHAIN CONVEYOR
Transport Level
900±75mm
Width, single conveyor ±0,5 mm / without CBS
50–400mm; Option1:50–460mm; Option2:50–508mm
Width, single conveyor ±0,5 mm / with CBS
65mm–400mm; Option1:100–460mm; Option2:140–508mm
Width, dual conveyor ±0,02 in
65mm–213mm(216mm)
Clearance above the conveyor
30mm
Pin chain support width
Standard3mm,optional5mm
Tolerance conveyor speed
(1%per1800mm/min)
CENTRE SUPPORT
Lash heigt
Lash stand off:16mm
Distance to fixed rail lowered
20mm
Center Support active Width
50mm–340mm; Option1:50–380mm; Option2:50–390mm
CBS Low(Parking Position)
14mm
OPERATING DATA
Maximum noise level
70dBA
Room temperature
between59Fand89,6F
Humidity
between30%and75%
Oxygen of peak zones
<100ppm
VOLTAGE SUPPLY CONSUMPTION
Type of power system
5-Wire-System
Connected load
58KW
COOLING WATER AT EXTERNAL COOLING
Connection
M28x1,5(22mm Cu Rohr/0,87in Cu Tube)
Cooling water flow
between 10–20 l/min(according to temperature)
Operating pressure
min.2bar–max.5ba
Differential pressure between forward and return run
min.0,5bar
NITROGEN SUPPLY
Connection
M16x1(12mm Cu Rohr)/M16x1(12mm/0,472in Cu Tube)
Nitrogen supply pressure
min.7bar–max.8bar
Operating pressure
5bar
Nitrogen consumption single conveyor at < 200 ppm in peak at min. 1 PCB gap
ca.20㎥/h
Nitrogen consumption double conveyor at < 200 ppm in peak zone at min. 1 PCB gap
ca.22㎥/h
EXHAUST PROCESS
Exhaust socket: diameter
150mm
Exhaust at min. 5 mbar underpressure
400㎥/h
Exhaust temperature
<50°C
System configuration VisionX-Series
Single lane
Cold condensation with cooler/filter units only nitro systems
Pyrolysis
integr. cooling circuit and heat exchanger for connection to ext. facility water supplies
Stand-By-Mode
Transmission zone
Software control for fan speed regulation
optional
Dual lane
Multi track
2nd Pyrolysis
Bottom cooling
PCU Power Cooling Unit
Internal cooling/elimination of heat emission
Measurement power consumption
Measurement nitrogen consumption
Supervision of volume flow with active readjustment
Product management
Traceability packages
Process interlock
ProCap
Profile Creator
KIC implementation
RPI
MES-Option ROI
SSP+
uick Exhaust
Pin in Paste
Copyright ©2025 深圳市五一表面贴装技术有限公司
粤ICP备16005436号
联系电话:0755-27820151
地址:广东省深圳市宝安区航城大道159号航城创新创业园a1栋510