JavaScript is required

Rehm 锐德 真空回流炉 VisionXP

设备尺寸(W*D*H): 6040x1576 x1570mm

设备重量: 3600kg

电源要求: 3x400VAC±5%50Hz/other voltages upon request

气源要求: min.7bar–max.8bar

设备简介:Reflow convection soldering is now even more efficient, more sustainable and easier to maintain! Rehm Thermal Systems presents the VisionXP+ with new features, such as energy-efficient EC fan motors, improvements in the cooling zone, and further developments in design and comprehensive operation data collection.展开更多

设备参数
设备文档
配件清单
PROCESS CHAMBER HEATING
type
type 634
Required area
9,52 m²
Load per unit area
400 kg/m²
Length
3150 mm
Quantity of preheating zones
6
Length of preheating zones
2100 mm
Quantity of peak zones
3
Length of peak zones
1050 mm
Max. permissible soldering temperature : preheating zones
300 °C
Max. permissible soldering temperature : peak zones
350 °C
Heat transfer through
Forced convection
Gas circulation per heating zone
max. 350m³/h
Warm up time
ca. 30min/approx 30min
Cross profile (Delta T = Tmax _ Tmin)
± 2,5 Kelvin
COOLING ZONE
Length
1400 mm
PIN CHAIN CONVEYOR
Transport Level
900±75 mm
Width, single conveyor ±0,5 mm / without CBS
Standard:50–400mm; Option1:50–460mm; Option2:50–508mm
Width, single conveyor ±0,5 mm / with CBS
Standard:65–400mm; Option1:100–460mm; Option2:140–508mm
Width, dual conveyor ±0,02 in
65mm–213mm(216mm)
Clearance above the conveyor
30 mm
Pin chain support width
Standard 3mm, optional 5mm
Tolerance conveyor speed
(1 % per 1800 mm/min)
CENTRE SUPPORT
Lash heigt
Lash stand off: 16mm
Distance to fixed rail lowered
20 mm
Center Support active Width
Standard:50–340mm; Option1:50–380mm; Option2:50–390mm
CBS Low (Parking Position)
14 mm
OPERATING DATA
Maximum noise level
70 dBA
Room temperature
between 59F and 89,6F
Oxygen of peak zones
<100 ppm
VOLTAGE SUPPLY CONSUMPTION
Type of power system
5-Wire-System
Connected load
73 KW
COOLING WATER AT EXTERNAL COOLING
Connection
M28x1,5(22mm Cu Rohr/0,87in Cu Tube)
Cooling water flow
between 10–20l/min(according to temperature)
Operating pressure
min.2bar–max.5ba
Differential pressure between forward and return run
min. 0,5 bar
NITROGEN SUPPLY
Connection
M16x1(12mm Cu Rohr)/M16x1(12mm/0,472in Cu Tube)
Nitrogen supply pressure
min.7bar–max.8bar
Operating pressure
5 bar
Nitrogen consumption single conveyor at < 200 ppm in peak at min. 1 PCB gap
ca. 21m³/h
Nitrogen consumption double conveyor at < 200 ppm in peak zone at min. 1 PCB gap
ca. 22m³/h
EXHAUST PROCESS
Exhaust socket: diameter
150 mm
Exhaust at min. 5 mbar underpressure
400m³/h
Exhaust temperature
< 50°C
System configuration VisionX-Series
Single lane
Cold condensation with cooler/filter units only nitro systems
Pyrolysis
integr. cooling circuit and heat exchanger for connection to ext. facility water supplies
Stand-By-Mode
Transmission zone
Software control for fan speed regulation
optional
Dual lane
Multi track
2nd Pyrolysis
Bottom cooling
PCU Power Cooling Unit
Internal cooling/elimination of heat emission
Measurement power consumption
Measurement nitrogen consumption
Supervision of volume flow with active readjustment
Product management
Traceability packages
Process interlock
ProCap
Profile Creator
KIC implementation
RPI
MES-Option ROI
SSP+
uick Exhaust
Pin in Paste
Copyright ©2025 深圳市五一表面贴装技术有限公司
粤ICP备16005436号
联系电话:0755-27820151
地址:广东省深圳市宝安区航城大道159号航城创新创业园a1栋510